This simple demo uses VisualView HMI and a AB Micrologix 1100. The program is designed to run with a PLC trainer from http://blftech.com/PLCTrainers.htm model ML1100

The HMI shows basic graphic animations. Buttons, gauge, hide/show, move, groups, etc. are used without any scripts.

The RLL program simulates a pump, tank level and several values.

The HMI project is in the Pump_Tank_Demo_ML1100_HMI directory and the RLL project is in the Pump_Tank_Demo_ML1100_RLL directory.

1. The PC needs to be connected to the PLC, with the PLC executing the ladder program.
2. Start VisualView HMI and select the project. Select start monitoring. The sample window will open and the elements will be animated.

The simulation window is 1024 * 768.

VisualView version 8.2 or higher required.

The I/O data assignments are:

Tagname					Address
Pump Running				I:0.0/0
Tank Valve Closed			I:0.0/1
Start/Stop Pump PB			I:0.0/6
Tank Valve Open/Close PB		I:0.0/8

Pump Run				O:0.0/0
Open Tank Valve				O:0.0/1
Open Discharge Value			O:0.0/2
Alarm					O:0.0/3

Start Pump CRT				B3:0/0
Stop Pump CRT				B3:0/1
Discharge Valve Opened			B3:0/10
Discharge Valve Closed			B3:0/11
Discharge Valve Travel			B3:0/12
Pump Failed to Start Fault		B3:0/5
Pump Failed to Stop Fault		B3:0/6
Open Discharge Valve CRT		B3:0/7
Close Discharge Valve CRT		B3:0/8
Open Tank Valve CRT			B3:1/0
Close Tank Valve CRT			B3:1/1
Tank Valve Failed to Open Fault		B3:1/5
Tank Valve Failed to Close Fault	B3:1/6
Acknowledge CRT				B3:10/0
Tank Level Hi Hi			B3:3/0
Tank Level Hi				B3:3/1
Tank Level Lo				B3:3/2
Tank Level Lo Lo			B3:3/3

Pump Pressure				N7:23
Tank Flow				N7:25
Tank Level				N7:24

If you have any problems, questions or comments please contact sales@blftech.com or support@blftech.com.


Copyright 2016 BLF-Tech LLC